Standard: | DIN, ANSI, GB, JIS, BSW |
---|---|
Material: | Red Copper |
Connection: | Welding |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Material | Copper | Connection | Welding | |
Application | Drinking Water,Heating,Sprinkler Systems | Shape | Equal | |
Size | 3/8 1/2 5/8 Produce as Customer Size | Technics | Hydroform | |
Standard | En1254-1,ASME B16.22,ASME B16.51,As3688 | Transport Package | Plastic Bag, Carton, Pallet. Recycle Bag and Carto | |
Application | Refrigeration and Air Conditioning | Production | Casting | |
Origin | China | Trademark | Li Chen | |
Production Capacity | 500 Tons/Per Month | HS Code | 74121000 |
Advantage: Experience the unparalleled excellence of our copper pipe fittings, crafted from premium-grade copper material that boasts superior thermal conductivity and remarkable corrosion resistance. Our fittings promise effortless welding, ensuring stable performance and an impressively long service life. Enjoy a flawlessly smooth surface, free of burrs, that underscores the high-quality craftsmanship of each component.
Instruction: Begin by meticulously cleaning the connection surface, ensuring optimal conditions for soldering. Once preparation is complete, proceed with soldering to flawlessly install your fittings, guaranteeing a robust and secure connection.
Application: Our Heavy-Duty Copper Fittings are the versatile solution for a variety of systems. Perfectly suited for plumbing, air conditioning, heat pump systems, as well as hydraulic and refrigeration systems, these fittings serve as an ideal choice for redirecting or altering the direction of copper pipes efficiently and effectively.
Q:Can you send samples?
A:Of course, we can send samples to all parts of the world.
Q:What are the shipping ports?
A:Under normal circumstances, we ship from Qingdao ports, you can choose other ports according to your needs.
Q:What are the certifications for your products?
A:We have ISO 9001, SGS, EWC and other certifications.
Q:How long does your delivery time take?
A:In general, our delivery time is within 7-15 days, and may be delayed if the demand is extremely large or special circumstances occur.
Q:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed.